Barbican Centre

Our Solution-

The City of London funded the partial replacement of the existing Satchwell and Andover control systems within the Barbican Centre and Guildhall School of Music.

We were employed to identify and strip out the existing control devices and install in its place a fully automated Trend BMS system. A central BMS bureau located within the facilities department provides the Barbican with the control, monitoring and interrogation of the 1650 points currently installed on the Trend system.

« Back to Case Studies List

At a Glance-

Industry:
Public

Location:
London